Services

Make-good, maintenance and common property works

Four services for community housing providers, government housing agencies and owners corporations, each run as a managed process. Below is how every job is inspected, quoted, scheduled, completed, documented and handed back.

Service one

Vacant property make-good

Full turnaround of a vacated unit, from first inspection to ready-to-let handover. Every day a property sits empty is rent you are not collecting, so the process is built to remove waiting time rather than to fill it.

Every trade a vacated unit needs

  • Inspection and photographic condition report of the vacated property
  • Itemised quotation separating your brief from any additional works we find
  • Patch, prepare and paint: full repaint or targeted make-good to your scheme colours
  • Flooring repair and replacement, including carpet, vinyl and timber-look flooring
  • Supply and installation of blinds and window furnishings
  • Appliance removal, supply and replacement
  • Plumbing works, with compliance certificates issued
  • Electrical works, with Certificates of Electrical Safety issued
  • Removal and lawful disposal of left-behind furniture, goods and rubbish
  • Defect rectification identified during inspection or handover
  • Final clean coordination and ready-to-let handover (or excluded where your organisation arranges cleaning)

Inspection to ready-to-let, in six steps

  1. Inspection within days of instruction. We attend the vacated property, photograph condition room by room, and record every defect against your brief.
  2. Itemised quotation returned. Priced from our published schedule of rates. Your requested scope is totalled on its own; anything additional we found is listed and priced separately for you to approve, decline or defer.
  3. Approval and scheduling. Once you approve, trades are booked in the correct sequence (strip-out and repairs before painting, painting before flooring and blinds) so the property is not sitting idle between visits.
  4. Delivery under one point of contact. One director coordinates every trade and is your single contact for the duration. You do not chase subcontractors.
  5. Documented handover. Completion photographs, compliance certificates where required, and confirmation of any variation approved along the way.
  6. 90-day defects liability. If something we did needs attention within 90 days of handover, we return and fix it.

Service two

Responsive and programmed maintenance

Repairs and planned works in occupied homes. The technical work is routine; the part that matters to your organisation is how our people conduct themselves in someone's home, and whether the job is closed out properly the first time.

Repairs we take in occupied homes

  • Reactive repairs in tenanted properties across all trades
  • Make-safe attendance for urgent defects
  • Planned and cyclical maintenance programs across a portfolio
  • Minimum rental standards compliance works under the Residential Tenancies Regulations
  • Smoke alarm and safety compliance works
  • Plumbing, electrical, carpentry, glazing, locks and hardware
  • Repairs arising from inspection reports or tenant-reported faults

Conduct in occupied properties

  • Access arranged with proper notice and confirmed appointment windows
  • Tradespeople who identify themselves on arrival and explain the work being done
  • Respectful conduct with residents, including vulnerable residents and households where English is a second language
  • Protection of floors and belongings, and the property left clean at the end of every visit
  • Any defect found beyond the reported fault reported back to you rather than actioned unilaterally
  • National Police Checks and Working with Children Checks held for personnel attending tenanted properties, evidenced to you before attendance and available for audit

Work order to closed out, in four steps

  1. Work order received from your maintenance system, by email, or by phone for urgent items.
  2. Triaged and scheduled. Urgent make-safe items attended first, routine repairs booked into the next available window.
  3. Attended and completed in a single visit wherever the fault allows, with parts sourced ahead of attendance where the fault is known.
  4. Closed out with evidence. Completion photographs and, where the fault could not be resolved on site, a clear explanation of what is required and what it will cost.

Service three

Building works and upgrades

Larger works that need a registered builder holding the risk, the sequencing and the compliance paperwork, held to the same quoting and documentation standard as a single repair.

Upgrade works under a registered builder

  • Bathroom renewals, including waterproofing
  • Kitchen renewals and replacement joinery
  • Accessibility modifications: grab rails, level-access showers, ramps, widened doorways and related works
  • Water damage rectification and make-safe works
  • Fire door replacement and fire compliance works
  • Glazing replacement and window repairs
  • Structural repairs within our registration categories
  • Whole-of-unit refurbishment between tenancies

Scope to handover, in six steps

  1. Site inspection and scope confirmation with your asset or project officer, including photographs and measurements.
  2. Itemised quotation with the cost build-up shown, so trade, material and supervision components are visible rather than rolled into a single figure.
  3. Program and trade sequencing issued with the quotation, so you know the duration before you commit, and can plan around the vacancy or the resident.
  4. Delivery under a registered building practitioner, with compliance certification for all regulated works.
  5. Handover pack: photographic record, certificates, product and warranty documentation for installed items.
  6. 90-day defects liability from practical completion.

Service four

Owners corporations and common property

Repairs and maintenance to common property for owners corporations and strata managers, quoted so a committee of non-experts can actually approve it. The technical work overlaps with everything above; what changes is who decides, and how the decision has to be documented.

Foundry's team has delivered common property and maintenance work for body corporate management companies in Melbourne. Referees available on request.

Common property works we take on

  • Common property repairs: lobbies, corridors, stairwells, car parks and shared amenities
  • Water ingress investigation and rectification, including balcony and podium areas
  • Balustrade and balcony repairs
  • Fire door replacement and fire compliance works
  • Glazing, doors, locks and access hardware
  • Make-safe attendance for urgent defects to common property
  • Reinstatement following an insured event, scoped so it reconciles to the insurer's assessment

Quoting that survives a committee meeting

Our two-part quotation was built for exactly this problem. The works you requested are itemised and totalled on their own; anything we find beyond that brief is listed and priced separately. A committee can approve part one, defer part two, and show owners precisely what each decision cost.

  • Quotations are written to be tabled: plain descriptions, itemised amounts, no trade shorthand a lot owner cannot follow
  • Where a scope spans both common property and a lot, the split is identified before work starts, so the owners corporation is not billed for what is an owner's responsibility, or the reverse
  • Where a scope straddles your committee's spending delegation, we split it. The part that can be approved by committee resolution is priced separately from the part that needs a general meeting, rather than handing you one total that has to wait for the next AGM. Tell us your scheme's delegation limit and we quote to it
  • Photographic condition reports support the recommendation, whether it goes to a circular resolution or is tabled at a general meeting
  • Variations are quoted and approved in writing, so nothing needs a second, awkward conversation with owners after the fact

Scope, after hours and conduct, in short

  • Non-structural common property maintenance. Taken on across your portfolio, unaffected by any height limit.
  • Structural work up to 15 m. Covered by our commercial registration CB-L 100149.
  • Structural and building-envelope work above 15 m. Checked against our registration scope before we accept it, not after we have quoted it.
  • After hours. No guaranteed response window advertised. Urgent make-safe is arranged case by case.
  • In occupied buildings. Notice before attendance, identification on arrival, work areas left clean.
The full position on registration scope, after hours and conduct in occupied buildings

What we will and will not take on

Our commercial registration (CB-L 100149) covers structural fit-out work and construction of low-rise building work, in commercial buildings up to 15 m in height, which takes in most walk-up and low-rise apartment stock. Non-structural common property maintenance across your portfolio is not affected by that limit.

For buildings above 15 m, structural and building-envelope work is checked against our registration scope before we accept it, not after we have quoted it. This covers balustrades, balcony and podium waterproofing, and water ingress rectification where the cause is structural. Where the work sits outside our registration, we say so and refer it to a builder who holds the right class, rather than taking it on and sorting the paperwork out later.

After hours

We do not advertise a guaranteed after-hours response window, because we will not sell an SLA we have not confirmed we can hold at 11pm on a Saturday. Urgent make-safe outside business hours is arranged case by case. If your buildings need a committed after-hours response, tell us what it needs to be and you will get a straight yes or no.

Working in occupied buildings

An apartment building is full of residents who did not choose us and cannot ask us to leave. The same conduct standards we apply in tenanted social housing apply here: notice before attendance, identification on arrival, work areas left clean, and escalation to the manager rather than argument with a resident or owner.

Send us the job

Send through a scope, a vacancy list or a work order and we will arrange inspection and return an itemised quotation.